Klipheuwel Wind Farm, covering over 350 hectares, is located 5km west of Caledon, in the Overberg region of the Western Cape, in the Theewaterskloof Local Municipality.
The 27 MW Klipheuwel Wind Farm is one of the first wind farms arising from the South African Government’s Renewable Energy Independent Power Producer Procurement Programme (REIPPPP). The wind farm generates approximately 86 gigawatt hours per year, supplying enough clean, renewable electrical energy to power more than 19 000 average South African homes.
The wind farm generates electricity using 9 Sinovel SL3000/113 wind turbine generators, each with a rated power output of 3 000kW, a rotor diameter of 113.3m and a hub height of 90m, and feeds into the 66kV line between Houwhoek and Caledon.
For more information, visit klipheuwelwind.co.za
Klipheuwel Wind Farm, d’une superficie de plus de 350 hectares, est situé à 5 km à l’ouest de Caledon, dans la région de l’Overberg, dans le Cap occidental, dans la municipalité de Theewaterskloof.
Klipheuwel Wind Farm de 27 MW est l’un des premiers parcs éoliens issu du programme d’approvisionnement en producteurs indépendants d’énergie renouvelable du gouvernement sud-africain (REIPPPP). Le parc éolien génère environ 86 gigawattheures par an, fournissant suffisamment d’énergie électrique propre et renouvelable pour alimenter plus de 19 000 foyers sud-africains moyens.
Le parc éolien produit de l’électricité à l’aide de 9 éoliennes Sinovel SL3000 / 113, chacune d’une puissance nominale de 3 000 kW, d’un diamètre de rotor de 113,3 m et d’une hauteur de moyeu de 90 m, et alimente la ligne à 66 kV reliant Houwhoek à Caledon.
Pour plus d’informations, visitez klipheuwelwind.co.za